KR-63 Wiring Diagram
Please note that the information below refers to Solar Analytics branded smart monitoring devices. For more information on Wattwatchers branded smart monitoring devices, please check outWattwatchers with Solar Analytics.
Note: Solar Analytics will no longer be accepting new WW registrations from 1 July 2026, with the WW service being fully retired and no longer available for new registrations effective 30 September 2026; however, existing Wattwatcher integrated sites will continue to be able to renew their subscriptions as normal.
Listed below are various wiring diagrams available for KR-63, but not limited to the following.
If you are on-site and this is your first Solar Analytics KR-63 installation, please download the Installation Cheat Sheet from this link or refer to the image below.
For other scenarios, please check the attachment below or click on this link in case if the attachments can’t be downloaded.
- 1 x KR-63 - Single Phase Mains Supply and Single Phase Inverter and Loads.pdf
- 2 x KR-63 - Three Phase Mains Supply and Three Phase Inverter and Loads.pdf
- 1 x KR-63 - Three Phase Supply Parallel Incoming Mains.pdf
- 1 x KR-63 - Three Phase Mains Supply and Three Phase Inverter.pdf
- 1 x 6CT_2ph Supply_1ph INV_1ph Loads_V1.0.pdf
- 1 x 6CT_3ph Supply_1ph Loads.pdf
- KR-63 Installation Cheat Sheet - KR-63 Installation Cheat Sheet.pdf